Urumqi · China (Xinjiang) Pilot Free Trade Zone SINCE 2021
Mon–Fri, 10:00–19:00 (closed on statutory holidays) 400-668-7228
Integration · Healthcare · Anonymised case

Unified video surveillance across three campuses

Three campuses stored footage separately, so a single cross-campus review took four hours.

HealthcareSouthern XinjiangA secondary general hospital (anonymised)Client name and figures anonymised
Illustrative scene: a security operator at a monitoring desk reviews multiple camera feeds while a colleague points at the screen.
AI-generated illustration · on-site photographs require authorisation

CASE FILE / HOSPITAL-SURVEILLANCE · ANONYMISED

01 / Background and challenge

The hospital had built surveillance separately at each of its three campuses, with different brands and storage arrangements. When the security office needed footage that spanned sites, staff had to contact three maintenance contractors in turn — an average of four hours for one clip.

Outpatient and inpatient areas are managed separately, and no upgrade could interrupt the queueing or billing systems. Before work started, the hospital set one condition: the core server-room links were not to be touched during the day.

02 / Approach

A unified access platform was deployed in the main campus server room, with the other two campuses feeding back under a tiered retention policy: 30 days of hot data, 180 days archived.

Existing cameras and part of the storage estate were retained and connected through gateway protocols, avoiding a wholesale replacement of front-end equipment.

Permissions were rebuilt by campus, department and role, with every review logged. Security, medical affairs and IT each received a separate visibility scope.

03 / Implementation

Phase one inventoried the live network and planned addressing; phase two cut over the main campus links at night; phase three connected the two branch campuses.

To protect outpatient services, core cutovers began after 22:00 and were verified for rollback before 07:00. The original links stayed available for 48 hours after each change.

The hospital IT department joined acceptance throughout, checking camera points, retention periods and review permissions line by line.

04 / Results and evidence

Cross-campus review fell from four hours to ten minutes.

Storage is tiered by access frequency, cutting annual storage cost by roughly 30%.

Review permissions and logs are traceable, meeting the hospital's internal audit requirements.

Case note: client names, specific figures and on-site photographs have been anonymised or replaced. Written client authorisation is required before publication. Results depend on project conditions and are not a commitment for other projects.
NEXT STEP

Put your scenario
in place of this case.

A case explains the method; it cannot replace your site conditions. Send us the current state and constraints, and we will establish the boundary before discussing a solution.

Service line 400-668-7228 Request a Quote
First response within one business day · Mon–Fri, 10:00–19:00
Call us Request a Quote