Systems Integration & Technical Services
Server rooms, networks, security, data and operations for hospitals and public-sector organisations, delivered by one team from survey through acceptance and handover.
Start with the problem, then the offer
The server room and the network are two separate ledgers
Equipment lists sit with IT, links with the carrier, and nobody can say which parts can be reused and which must be replaced.
Cutovers threaten live services
Outpatient, billing and inpatient systems cannot stop, so every change has to fit a narrow window with a tested rollback.
Acceptance documents arrive late
Drawings, equipment lists and acceptance forms are assembled at the end, often missing the detail the client needs to take over.
Operations have no owner
After go-live, no one is responsible for patching, monitoring, backups or the handover to an internal team.
Layered delivery, each layer documented
We do not deliver equipment lists as proposals. Every layer states the current condition, the reason for change, the downtime impact and the acceptance criteria.
Three common starting points
A single area can be upgraded, or the whole estate delivered together. Each starting point can be scoped separately.
Hospital IT and server rooms
Server room, power, core network, wireless and system interfaces, with outpatient and billing continuity as the first constraint.
Can be scoped on its ownSecurity and low voltage
Video surveillance, access control, public address, parking and command centre, with unified access and permission audit.
Can be scoped on its ownData and operations
Storage policy, backup, interface gateways, duty inspection and maintenance handover.
Can be scoped on its ownWhat this line actually does
Server room and infrastructure
Power, cooling, racks and structured cabling, surveyed and delivered with drawings.
Network and security
Core switching, wireless coverage, border security and support for classified-protection assessment.
Security and low voltage
Video surveillance, access control, public address and command centres with unified access and audit.
Data and platform
Tiered storage, backup, interface gateways and permission models.
Operations and handover
Monitoring, routine inspection, maintenance windows and a documented handover.
Set the boundary before the price
We do / WE DO
- Survey the existing estate and document it
- Design and deliver layered solutions
- Plan cutovers and rollback
- Provide acceptance documents and handover
We do not / WE DON'T
- Guarantee a classified-protection assessment outcome
- Take responsibility for carrier services
- Certify third-party software
- Change clinical systems without approval
You provide / YOU PROVIDE
- Existing equipment and network details
- Downtime windows and business priorities
- Acceptance and security requirements
- Internal owner for handover
Four steps from enquiry to delivery
Survey and boundary
Inventory equipment, links and maintenance status; agree what can be reused.
Output: survey reportDesign and proposal
Layered design with must-replace, recommended-replace and keep separated.
Output: proposal and equipment listImplementation
Staged delivery to agreed windows with rollback plans.
Output: implementation recordsAcceptance and handover
Test against the acceptance criteria and hand over documents and training.
Output: acceptance pack and O&M guideTwo reference points

Unified video surveillance across three campuses
Each campus ran its own surveillance system with a different brand and storage design. Pulling one clip that crossed campuses meant calling three maintenance contractors and waiting an average of four hours.

Command centre and low-voltage systems upgrade for an industrial park
Three systems operated independently, so the duty officer watched three monitors at once and relayed alarms by phone.
Common questions on this line
Three things to prepare
- Scenario: where it will be used and what problem it solves.
- Timing: expected start, delivery or event date.
- Boundary: existing conditions, mandatory qualifications and acceptance requirements.
Yes. We inventory existing equipment, protocols and maintenance status, keep what can be reused, and state the reason and budget for anything that must be replaced.
Send your integration requirement
to the right person
First response within one business day. Where authorisations, certificates or approval documents are involved, we send the document checklist first, then quote.
Service hotline
400-668-7228First response within one business dayBusiness email
getiontec@163.comEnquiries and document requestsResponse hours
Mon–Fri, 10:00–19:00 (closed on statutory holidays)
First response within one business day
Or start with
the other four lines.
One client may need devices, events, testing products, routine supplies or systems work. Each line contracts independently, and we can coordinate a single point of contact.